
PM Modi inaugurates the world’s highest Chenab rail Bridge in J&K, flags off Vande Bharat to Srinagar, and launches ₹46,000 crore infrastructure projects.
Prime minister Narendra Modi today inaugurated the iconic Chenab rail Bridge in Reasi, kashmir - SRINAGAR/JAMMU' target='_blank' title='jammu and kashmir-Latest Updates, Photos, Videos are a click away, CLICK NOW'>jammu and kashmir, marking a historic milestone in India’s infrastructure journey. The bridge, part of the Udhampur-Srinagar-Baramulla rail Link (USBRL) project, is now the world’s tallest railway arch bridge and a testament to India's engineering excellence.
Arriving at the air Force Station in Udhampur earlier in the day, PM Modi flew by chopper to the inauguration site. He later flagged off the first Vande Bharat Express from Katra to Srinagar, celebrating the completion of the 272-km USBRL project that links kashmir with the rest of india through seamless rail connectivity.
PM Modi also inaugurated India’s first cable-stayed Anji Bridge and dedicated multiple infrastructure projects worth over ₹46,000 crore, including new roads, flyovers, and the Shri Mata vaishno devi Institute of Medical Excellence.
The Chenab Bridge, lauded globally for its structural complexity and strategic significance, stands as a symbol of national pride. dilip Kumar, Executive director of the Railway Board, hailed it as “one of the most historic milestones since independence.”
Anji Khad Bridge: India’s First Cable-Stayed Railway Bridge
In another major milestone, PM Modi also inaugurated the Anji Khad Bridge, India’s first cable-stayed railway bridge, built over the Anji River in the same district. This trailblazing structure connects Katra and Reasi, further enhancing rail connectivity in a region marked by extreme geographical challenges.
Set against the snow-capped Himalayan backdrop and located about 80 km from Jammu, the Anji Bridge is an emblem of innovation and resilience. Union Railway minister Ashwini Vaishnaw shared a breathtaking video of the bridge on friday with a poetic caption in Hindi: "Think firmly, There is a wide path of virtue, Keep moving forward. Keep moving forward."
Key Features of the Anji Khad Bridge
India’s first cable-stayed railway bridge
Total length: 725 metres
Height above riverbed: 331 meters
Main pylon height: 193 meters (inverted Y-shaped)
Anchored by: 96 high-tensile cables
Total cable length used: 653 kilometers.
Steel used: Over 8,200 metric tonnes
Construction period: Completed in just 11 months
Massive Infrastructure Push
Alongside these feats, PM Modi also dedicated infrastructure projects worth over ₹46,000 crore, which include new roads, flyovers, and the Shri Mata vaishno devi Institute of Medical Excellence, reinforcing the government’s commitment to transforming the connectivity and healthcare landscape in Jammu and Kashmir.